WP 6 – Integration and validation

The following reports are public and approved:

D6.1 Integration and validation plan

  • Delivery date: 2017-02-27
  • PDF
  • Abstract: This deliverable presents the planning of the tests that will be performed during the trials in order to enable the proposed KPIs. Each test is presented in detail of how it will be performed and what the presumed outcome will be. A detailed description is also included regarding the involvement of users, data handling and how gender aspects will be taken into consideration in the OPTi project.

D6.2 Test report Ver 1

  • Delivery date: 2017-04-29
  • PDF
  • Abstract: This deliverable is part of the Work Package 6 (Integration and Validation) and is the first version of the test report. It describes the methodology for evaluating all the tests prescribed in the project including both those on the
    simulator and the pilot sites. It delineates the methods for validating the
    achievement of the target KPIs. Moreover, it also presents results from some of
    the initial field trials that have been conducted in Luleå and Mallorca.
  • Note: This report is replaced by D6.3

D6.3 Test report Ver 2

  • Delivery date: 2018-04-30
  • PDF
  • Abstract: This deliverable is part of the Work Package 6 (Integration and Validation) and is the final version of the test report. It describes the methodology for evaluating all the tests conducted in the project, both at the pilot sites and the in the simulator OPTi-Sim. It also delineates the methods for validating the achievement of the targeted KPIs. Results from the field trials conducted at the pilot sites in Luleå and Mallorca, as well as all the simulator, are presented, analysed and discussed. The result provides insights and recommendations, and some conclusions on the tests in general.